OK, so QVC said it would be delivered on Jan 14th or before. 
I checked the tracking of it today, and UPS says...
Scheduled Delivery Updated To: Monday, 01/13/2014, By End of Day
Hell yeah, I can deal with that!
 
You know, if I did not require electric, internet and phone for my job, I would seriously be considering living without all of that crap!!!
And while I am thinking...
I think tonight I will have to wear something furzy, it is damn cold at my place!
 
I refuse to go into debt for a home!!!

Concrete Slab, 55 yards ($4,800.00) or 3210 -60lb Bags at $2.76 ($8,859.60)

Cob is out, because I would have to ship the clay in, and they kinda defeats the purpose of building cob!

Straw Bale, I am having trouble locating them for a reasonable amount in my area.

Cinder Blocks (8X8X16") are $1.78 each (I need about 1,600), $2,848.00, plus about 50 bags of mortar.

As of right now, I am thinking of papercrete.  It seems to be the most inexpensive solution to me owning my own home.  I can get a similar look to cob, which I love so much.



 
There are a few things I HAVE to have before I can begin building...

WATER:  To have Kingsland Water Supply Corp run water to my property is it the
unbelievable amount of $3,500.00.  Having a well drilled is way more money!  And the chances of hitting water on my property are pretty slim, the people that own the land just behind my land said they drilled 4 times and never got water.

ELECTRIC:  To have CTEC Coop to run electric to my property, it is going to cost 570.00+ (They would not give me an exact amount)

TELEPHONE: Verizon can not give me any amount at all until CTEC has installed the poles...  (Telephone & Internet (I have to have for work))

SEPTIC TANK: I know a guy that used to do this, he said he would do it for me, if I purchase the materials and rent the equipment.